4/28/2020 Update

I have finally finished the floor for the bedroom. I added 5 1/2″ EPS foam insulation on the floor, a layer of OSB since the floors in the adjacent rooms were 1/2″ higher and then finished off with 3/4″ tongue and groove sub floor. All this is held together by both floor screws as wellContinue reading “4/28/2020 Update”

Design a site like this with WordPress.com
Get started