4/23/2020 Update

It has been an interesting couple of weeks since the last post. With having to move all schooling online and trying to get work done around the house as well has been an adventure. With the the concrete finally dry enough to put weight on them, I have starting to install the adjustable posts and supporting beams. With the weather getting nicer and finally changing to spring, things should start moving a little easier. Hopefully thing weekend I will be able to have the complete sub-floor installed. Since I work for a SIPs company, I will be installing EPS throughout the entire floor allowing for a higher R-value, and using a specific SIPs adhesive it will become structural as well. After the sub-floor is in, it will be time to put that room project on hold and start to put my time and effort to the exterior, using the bedroom as a rainy day project.